Recorded through 2026-10-18 · Maine recorded through 2026-10-15 · compared day to day since 2026-09-27 · Pennsylvania, New York, DC and Maine
What changed since 2026-09-27
Every day OfferTrail reads the supplier offers that four official state sources list and compares them with the day before. From 2026-09-28 to 2026-10-18 we recorded 908 re-pricings, 80 new offers and 92 withdrawals. An offer re-priced on three days counts three times.
- Re-pricings
- 908
- New offers
- 80
- Withdrawals
- 92
- Recorded through
- 2026-10-18
By state
Changes from 2026-09-28 to 2026-10-18. Pennsylvania counts the residential rate classes of PECO and PPL. New York, DC and Maine count every utility their site lists; New York's list includes gas offers.
| State | Source | Utilities | Offers listed on 2026-10-18 | New offers | Withdrawals | Re-pricings | Terms changes |
|---|---|---|---|---|---|---|---|
| Pennsylvania | PA Power Switch (PA PUC) | 2 | 350 | 53 | 60 | 637 | 20 |
| New York | NYS Power to Choose (NY DPS) | 8 | 457 | 17 | 14 | 245 | 1 |
| District of Columbia | DC Power Connect (DC PSC) | 1 | 17 | 8 | 16 | 8 | 0 |
| Maine | Maine Office of the Public Advocate | 2 | 47 (on 2026-10-15) | 2 | 2 | 18 | 0 |
Maine's table is kept by the Public Advocate and updated about once a month, so most days show no change there.
Maine recorded through 2026-10-15. Its later days, up to 2026-10-18, are not recorded yet, so they count neither as changes nor as days without changes.
The 5 largest re-pricings
Ranked by the size of the rate change, up or down, as a share of the old rate.
| Date | State | Utility | Supplier | Offer | Old rate | New rate | Change |
|---|---|---|---|---|---|---|---|
| 2026-10-06 | PA | PPL Electric Utilities | Agway Energy Services LLC | Variable 0 Months, RS - Regular Residential Service (offer 1482) | 19.90¢/kWh | 12.90¢/kWh | -35.2% |
| 2026-10-06 | NY | New York State Electric & Gas Corporation | Energy Cooperative of New York | electric Variable 1 Month(s), NYSEG in Zone F | 9.45¢/kWh | 12.74¢/kWh | +34.8% |
| 2026-10-06 | NY | New York State Electric & Gas Corporation | Energy Cooperative of New York | electric Variable 1 Month(s), NYSEG in Zone G | 9.70¢/kWh | 12.87¢/kWh | +32.6% |
| 2026-10-06 | NY | New York State Electric & Gas Corporation | Energy Cooperative of New York | electric Variable 1 Month(s), NYSEG in Zone H | 9.70¢/kWh | 12.87¢/kWh | +32.6% |
| 2026-10-04 | NY | Consolidated Edison Company of New York, Inc. | ABN Energy, LLC | electric Variable 1 Month(s), ConEd in All Zones | 24.02¢/kWh | 19.00¢/kWh | -20.9% |
Rates as listed. New York lists some electric offers at $1.00 per kWh, and Pennsylvania's Unlimited plans bill a flat amount; both are in the CSV but not in this ranking.
Per utility, per day
Each cell shows new / withdrawn / re-priced offers on that day. A dash means no change. n/r means not recorded: Maine through 2026-10-15. The last two columns are the totals and the offers whose rate stayed the same but whose term, fees, rate type, renewable share or plan text changed.
| State | Utility | Sep 28 | Sep 29 | Sep 30 | Oct 1 | Oct 2 | Oct 3 | Oct 4 | Oct 5 | Oct 6 | Oct 7 | Oct 8 | Oct 9 | Oct 10 | Oct 11 | Oct 12 | Oct 13 | Oct 14 | Oct 15 | Oct 16 | Oct 17 | Oct 18 | Total | Terms changed |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| PA | PECO Energy | – | 0 / 0 / 6 | 0 / 0 / 33 | 0 / 0 / 33 | 1 / 0 / 41 | 0 / 0 / 13 | – | – | 0 / 0 / 34 | 0 / 0 / 10 | 0 / 1 / 25 | 0 / 1 / 17 | 1 / 2 / 29 | – | – | 0 / 2 / 15 | 0 / 1 / 15 | 2 / 14 / 11 | 16 / 12 / 19 | 10 / 1 / 17 | – | 30 / 34 / 318 | 15 |
| PPL Electric Utilities | – | 0 / 0 / 7 | 0 / 0 / 27 | 0 / 0 / 41 | 1 / 0 / 32 | 0 / 0 / 13 | – | – | 0 / 0 / 27 | 0 / 0 / 18 | 0 / 1 / 15 | 6 / 7 / 40 | 0 / 1 / 31 | – | – | 0 / 1 / 11 | 1 / 1 / 15 | 2 / 8 / 12 | 6 / 7 / 17 | 7 / 0 / 13 | – | 23 / 26 / 319 | 5 | |
| NY | Central Hudson Gas & Electric Corporation | – | 1 / 0 / 1 | – | 0 / 0 / 4 | – | 0 / 1 / 6 | – | – | 0 / 0 / 1 | 0 / 0 / 3 | 1 / 0 / 0 | 0 / 0 / 1 | – | 0 / 1 / 0 | – | 1 / 0 / 0 | 0 / 0 / 3 | – | 0 / 0 / 2 | – | – | 3 / 2 / 21 | 0 |
| Consolidated Edison Company of New York, Inc. | 1 / 0 / 0 | 0 / 0 / 1 | 0 / 1 / 0 | 0 / 0 / 4 | 1 / 0 / 1 | 0 / 0 / 17 | 1 / 0 / 4 | – | 0 / 0 / 3 | 0 / 1 / 6 | 0 / 1 / 2 | 0 / 0 / 3 | 0 / 0 / 3 | 0 / 6 / 0 | – | 6 / 0 / 0 | – | – | 1 / 0 / 3 | – | – | 10 / 9 / 47 | 1 | |
| Long Island Power Authority | – | – | – | – | – | – | – | – | – | – | – | – | – | – | – | – | – | – | – | – | – | 0 / 0 / 0 | 0 | |
| National Fuel Gas Distribution Corporation | – | 0 / 0 / 1 | – | – | – | – | – | – | – | 0 / 0 / 1 | – | – | – | – | – | 0 / 0 / 1 | 0 / 0 / 1 | – | – | – | – | 0 / 0 / 4 | 0 | |
| New York State Electric & Gas Corporation | – | – | – | 0 / 0 / 12 | 0 / 0 / 1 | 0 / 0 / 18 | – | – | 0 / 0 / 17 | 0 / 0 / 3 | – | 0 / 0 / 4 | 0 / 0 / 2 | – | – | – | 0 / 0 / 3 | – | 0 / 0 / 6 | – | – | 0 / 0 / 66 | 0 | |
| Niagara Mohawk Power Corporation d/b/a National Grid | – | – | – | 0 / 0 / 18 | 0 / 0 / 1 | 0 / 0 / 18 | – | – | 0 / 0 / 12 | 0 / 0 / 6 | – | 0 / 0 / 3 | 0 / 0 / 2 | – | – | – | 0 / 0 / 4 | – | 0 / 0 / 5 | – | – | 0 / 0 / 69 | 0 | |
| Orange and Rockland Utilities, Inc. | 1 / 0 / 0 | 1 / 0 / 0 | – | – | – | 0 / 0 / 5 | – | – | 0 / 0 / 1 | 0 / 0 / 3 | – | – | 0 / 0 / 2 | 0 / 2 / 0 | – | 2 / 0 / 0 | 0 / 0 / 4 | – | 0 / 0 / 1 | – | – | 4 / 2 / 16 | 0 | |
| Rochester Gas and Electric Corporation | – | – | 0 / 1 / 0 | 0 / 0 / 4 | 0 / 0 / 1 | 0 / 0 / 5 | – | – | 0 / 0 / 2 | 0 / 0 / 3 | – | – | 0 / 0 / 2 | – | – | – | 0 / 0 / 4 | – | 0 / 0 / 1 | – | – | 0 / 1 / 22 | 0 | |
| DC | Pepco | – | 0 / 0 / 1 | 0 / 0 / 3 | – | – | 0 / 2 / 0 | – | – | 2 / 0 / 0 | 0 / 0 / 3 | – | 0 / 2 / 0 | 2 / 0 / 0 | – | – | – | 0 / 0 / 1 | – | 4 / 12 / 0 | – | – | 8 / 16 / 8 | 0 |
| ME | CMP | – | – | – | – | – | 1 / 1 / 7 | – | – | 0 / 0 / 2 | – | – | – | – | – | – | – | – | – | n/r | n/r | n/r | 1 / 1 / 9 | 0 |
| Versant (Bangor Hydro) | – | – | – | – | – | 1 / 1 / 7 | – | – | 0 / 0 / 2 | – | – | – | – | – | – | – | – | – | n/r | n/r | n/r | 1 / 1 / 9 | 0 |
How a change is counted
- New: an offer listed that was not listed the day before.
- Withdrawn: an offer that is no longer in a complete listing. A day a site could not be read is a gap, never a withdrawal.
- Re-priced: the offer's rate changed from one day to the next. Each day's change counts once.
- Not counted: a new "last updated" date, a new tracking link, or a re-issued offer with identical terms. New York and DC give an edited offer a new id; we pair it with the offer it replaced, so a re-pricing counts once.
The file
The CSV has 1,284 rows, one per changed field: date, state, utility, supplier, offer id, offer, commodity, unit, kind of change, field, old value, new value. Rates are in US dollars per kWh, therm or ccf, as listed. Download it.
This page is rebuilt from the daily record; the date at the top is the last day it includes. Offer terms change, so check the state site or the supplier before you rely on a figure. Sources and method: how the offers are collected.
One supplier's changes, next to its competitors
Each of the 90 suppliers listed on these sites has a page: every change to its offers since 2026-09-27 with its date, how often it changed offers compared with the median competitor in the same utilities, and its rates against the competitor median, recorded through 2026-10-18 (Maine through 2026-10-15). Free, with a CSV.