Recorded through 2026-10-05 · compared day to day since 2026-09-27 · Maine
Ambit Energy: offer changes since 2026-09-27
From 2026-09-27 to 2026-10-05, Ambit Energy made no change to its listed offers: no new offer, none withdrawn, no rate or term changed.
- Re-pricings
- 0
- New offers
- 0
- Withdrawals
- 0
- Recorded through
- 2026-10-05
Listed for: CMP (ME), Versant (Bangor Hydro) (ME).
How often it changed offers, next to its competitors
Competitors: the 9 other suppliers listed for the same utilities and customer class from 2026-09-27 to 2026-10-05. The median of their change counts, each supplier counted once.
| Change | Ambit Energy | Competitor median |
|---|---|---|
| New offers | 0 | 0 |
| Withdrawals | 0 | 0 |
| Re-pricings | 0 | 0 |
| Terms changes | 0 | 0 |
| All changes | 0 | 2 |
Its rates against the competitor median
Each offer it listed on 2026-10-05, against the median rate of competitors' offers for the same utility, customer class, commodity, rate type and term. With fewer than three such offers there is no median.
| State | Utility | Offer | Rate | Competitor median | Competitor offers | Difference |
|---|---|---|---|---|---|---|
| ME | CMP | Maine State Select 12 | 14.50¢/kWh | 16.49¢/kWh | 9 | -12.1% |
| ME | CMP | Ultimate Perks 12 | 15.00¢/kWh | 16.49¢/kWh | 9 | -9.0% |
| ME | CMP | Winter Break 12 | 19.00¢/kWh | 16.49¢/kWh | 9 | +15.2% |
| ME | CMP | Winter Break 24 | 19.50¢/kWh | 16.99¢/kWh | 3 | +14.8% |
| ME | Versant (Bangor Hydro) | Maine State Select 12 | 14.50¢/kWh | 17.09¢/kWh | 8 | -15.2% |
| ME | Versant (Bangor Hydro) | Ultimate Perks 12 | 15.00¢/kWh | 17.09¢/kWh | 8 | -12.2% |
| ME | Versant (Bangor Hydro) | Winter Break 12 | 18.75¢/kWh | 17.09¢/kWh | 8 | +9.7% |
| ME | Versant (Bangor Hydro) | Winter Break 24 | 19.25¢/kWh | – | 2 | fewer than 3 to compare |
How a change is counted
New: listed, and not listed the day before. Withdrawn: no longer in a complete listing; a day a site could not be read is a gap, never a withdrawal. Re-priced: the rate changed. Terms changed: same rate, but the term, fees, rate type, renewable share or plan text changed. A new "last updated" date or a re-issued offer with identical terms is not counted. All suppliers' changes · method.
The record
Source: Maine Office of the Public Advocate. Rates as listed, in US cents per kWh, or dollars per therm or ccf. This page is rebuilt from the daily record; it includes every day up to 2026-10-05. Offer terms change, so check the state site or the supplier before you rely on a figure. OfferTrail is not affiliated with any state body, utility or supplier.