Recorded through 2026-10-05 · compared day to day since 2026-09-27 · New York
Chief Energy Power, LLC: offer changes since 2026-09-27
From 2026-09-27 to 2026-10-05, Chief Energy Power, LLC made no change to its listed offers: no new offer, none withdrawn, no rate or term changed.
- Re-pricings
- 0
- New offers
- 0
- Withdrawals
- 0
- Recorded through
- 2026-10-05
Listed for: Consolidated Edison Company of New York, Inc. (NY), Niagara Mohawk Power Corporation d/b/a National Grid (NY), Orange and Rockland Utilities, Inc. (NY).
How often it changed offers, next to its competitors
Competitors: the 41 other suppliers listed for the same utilities and customer class from 2026-09-27 to 2026-10-05. The median of their change counts, each supplier counted once.
| Change | Chief Energy Power, LLC | Competitor median |
|---|---|---|
| New offers | 0 | 0 |
| Withdrawals | 0 | 0 |
| Re-pricings | 0 | 0 |
| Terms changes | 0 | 0 |
| All changes | 0 | 0 |
Its rates against the competitor median
Each offer it listed on 2026-10-05, against the median rate of competitors' offers for the same utility, customer class, commodity, rate type and term. With fewer than three such offers there is no median.
| State | Utility | Offer | Rate | Competitor median | Competitor offers | Difference |
|---|---|---|---|---|---|---|
| NY | Consolidated Edison Company of New York, Inc. | electric Fixed 12 Month(s), ConEd in Zone H | 15.59¢/kWh | 17.74¢/kWh | 28 | -12.1% |
| NY | Consolidated Edison Company of New York, Inc. | electric Fixed 12 Month(s), ConEd in Zone I | 15.69¢/kWh | 17.74¢/kWh | 28 | -11.6% |
| NY | Consolidated Edison Company of New York, Inc. | electric Fixed 12 Month(s), ConEd in Zone J | 16.89¢/kWh | 17.74¢/kWh | 28 | -4.8% |
| NY | Niagara Mohawk Power Corporation d/b/a National Grid | electric Fixed 12 Month(s), NGRID in Zone A | 13.65¢/kWh | 16.29¢/kWh | 37 | -16.2% |
| NY | Niagara Mohawk Power Corporation d/b/a National Grid | electric Fixed 12 Month(s), NGRID in Zone B | 13.67¢/kWh | 16.29¢/kWh | 37 | -16.1% |
| NY | Niagara Mohawk Power Corporation d/b/a National Grid | electric Fixed 12 Month(s), NGRID in Zone D | 13.69¢/kWh | 16.29¢/kWh | 37 | -16.0% |
| NY | Niagara Mohawk Power Corporation d/b/a National Grid | electric Fixed 12 Month(s), NGRID in Zone E | 13.89¢/kWh | 16.29¢/kWh | 37 | -14.7% |
| NY | Niagara Mohawk Power Corporation d/b/a National Grid | electric Fixed 12 Month(s), NGRID in Zone C | 14.30¢/kWh | 16.29¢/kWh | 37 | -12.2% |
| NY | Niagara Mohawk Power Corporation d/b/a National Grid | electric Fixed 12 Month(s), NGRID in Zone F | 15.99¢/kWh | 16.29¢/kWh | 37 | -1.8% |
| NY | Orange and Rockland Utilities, Inc. | electric Fixed 12 Month(s), ORU in All Zones | 15.99¢/kWh | 18.04¢/kWh | 12 | -11.4% |
How a change is counted
New: listed, and not listed the day before. Withdrawn: no longer in a complete listing; a day a site could not be read is a gap, never a withdrawal. Re-priced: the rate changed. Terms changed: same rate, but the term, fees, rate type, renewable share or plan text changed. A new "last updated" date or a re-issued offer with identical terms is not counted. All suppliers' changes · method.
The record
Source: NYS Power to Choose (NY DPS). Rates as listed, in US cents per kWh, or dollars per therm or ccf. This page is rebuilt from the daily record; it includes every day up to 2026-10-05. Offer terms change, so check the state site or the supplier before you rely on a figure. OfferTrail is not affiliated with any state body, utility or supplier.