OfferTrailOffer record from 2026-09-27: PA, NY, DC, ME

Recorded through 2026-10-05 · compared day to day since 2026-09-27 · Maine

XOOM Energy: offer changes since 2026-09-27

From 2026-09-27 to 2026-10-05 we recorded 4 re-pricings, 0 new offers, 0 withdrawals and 0 terms changes for XOOM Energy. An offer re-priced on three days counts three times.

Re-pricings
4
New offers
0
Withdrawals
0
Recorded through
2026-10-05

Listed for: CMP (ME), Versant (Bangor Hydro) (ME).

How often it changed offers, next to its competitors

Competitors: the 9 other suppliers listed for the same utilities and customer class from 2026-09-27 to 2026-10-05. The median of their change counts, each supplier counted once.

ChangeXOOM EnergyCompetitor median
New offers00
Withdrawals00
Re-pricings40
Terms changes00
All changes40

Every offer change, with its date

Compared day to day with the offers the state site listed the day before.

DateStateUtilityOfferChangeOld rateNew rateOther fields
2026-10-03MECMP12 Monthsre-priced15.99¢/kWh16.49¢/kWh (+3.1%)–
2026-10-03MECMP24 Monthsre-priced15.99¢/kWh16.99¢/kWh (+6.3%)–
2026-10-03MEVersant (Bangor Hydro)12 Monthsre-priced15.99¢/kWh16.99¢/kWh (+6.3%)–
2026-10-03MEVersant (Bangor Hydro)24 Monthsre-priced16.49¢/kWh16.99¢/kWh (+3.0%)–

Its rates against the competitor median

Each offer it listed on 2026-10-05, against the median rate of competitors' offers for the same utility, customer class, commodity, rate type and term. With fewer than three such offers there is no median.

StateUtilityOfferRateCompetitor medianCompetitor offersDifference
MECMP12 Months16.49¢/kWh15.80¢/kWh11+4.4%
MECMP24 Months16.99¢/kWh18.89¢/kWh3-10.1%
MECMPVariable17.19¢/kWh–0fewer than 3 to compare
MEVersant (Bangor Hydro)12 Months16.99¢/kWh16.29¢/kWh10+4.3%
MEVersant (Bangor Hydro)24 Months16.99¢/kWh–2fewer than 3 to compare
MEVersant (Bangor Hydro)Variable16.49¢/kWh–0fewer than 3 to compare

How a change is counted

New: listed, and not listed the day before. Withdrawn: no longer in a complete listing; a day a site could not be read is a gap, never a withdrawal. Re-priced: the rate changed. Terms changed: same rate, but the term, fees, rate type, renewable share or plan text changed. A new "last updated" date or a re-issued offer with identical terms is not counted. All suppliers' changes · method.

The record

Source: Maine Office of the Public Advocate. Rates as listed, in US cents per kWh, or dollars per therm or ccf. This page is rebuilt from the daily record; it includes every day up to 2026-10-05. Offer terms change, so check the state site or the supplier before you rely on a figure. OfferTrail is not affiliated with any state body, utility or supplier.

Find another supplier